• You are currently viewing our forum as a guest, which gives you limited access to view most discussions and access our other features. By joining our free community, you will have access to additional post topics, communicate privately with other members (PM), view blogs, respond to polls, upload content, and access many other special features. Registration is fast, simple and absolutely free, so please join our community today! Just click here to register. You should turn your Ad Blocker off for this site or certain features may not work properly. If you have any problems with the registration process or your account login, please contact us by clicking here.

[Te] Scheduling preferences

Ghost of the dead horse

filling some space
Joined
Sep 7, 2007
Messages
3,553
MBTI Type
ENTJ
What kind of tasks do you schedule for yourself - do you focus on the time you want to use for some topic, or the results you want?

I.e.
a) Monday: use 2 hours cleaning the house
b) Clean the house well enough so you'll be proud to invite your friends for dinner

a) Tuesday: read for exam 6 hours
b) Tuesday: prepare for exam well enough so you can answer anything about the book's topics well enough

a) Wednesday: 1 hour for weekly shopping
b) Wednesday: get in, buy what you need, get out

..or some other flavor, (c), (d), (x)?
 

Such Irony

Honor Thy Inferior
Joined
Jul 23, 2010
Messages
5,059
MBTI Type
INtp
Enneagram
5w6
Instinctual Variant
sp/so
Definitely B. I often find that tasks take longer or shorter than I initially thought.
 

Coriolis

Si vis pacem, para bellum
Staff member
Joined
Apr 18, 2010
Messages
27,193
MBTI Type
INTJ
Enneagram
5w6
Instinctual Variant
sp/sx
I do a combination, mixing long-term and short-term scheduling. If I know I have an exam in a week, the overall schedule is to be prepared in time for the exam. I then identify what blocks of time I have each day to study, based on other activities and commitments. I then divide up the studying among those blocks, leaving some time at the end in case it takes longer than expected. This might look like: review chapters 1-5 on Monday (2 hours), chapters 6-9 on Tues (3 hours), homework problems on Thurs (3 hours), meet with study group Saturday (2-3 hours). Extra study time Sunday afternoon if needed. If I run over on any segment, I need either to make it up in the next time slot, or take time away from another activity. If I get ahead, I either keep going into the next time slot's allotment, or use the time for something else.
 

Istbkleta

New member
Joined
Jun 11, 2011
Messages
452
MBTI Type
ISFP
Enneagram
2
Instinctual Variant
so/sx
Case by case:

I prefer A - it keeps life simple and managable. Requires compromises with quality.

B is for long-term goals, that have to happen. I define it not as "well enough" but as "I'm getting exactly this or similar result regardless of time or efforts. No compromises with quality".

Also B is for important things I do for the first time when I expect to be doing them again frequently.

A is a sprint (within a day).
B is a marathon (weeks/months/years).
 

ceecee

Coolatta® Enjoyer
Joined
Apr 22, 2008
Messages
15,914
MBTI Type
INTJ
Enneagram
8w9
I do a combination, mixing long-term and short-term scheduling. If I know I have an exam in a week, the overall schedule is to be prepared in time for the exam. I then identify what blocks of time I have each day to study, based on other activities and commitments. I then divide up the studying among those blocks, leaving some time at the end in case it takes longer than expected. This might look like: review chapters 1-5 on Monday (2 hours), chapters 6-9 on Tues (3 hours), homework problems on Thurs (3 hours), meet with study group Saturday (2-3 hours). Extra study time Sunday afternoon if needed. If I run over on any segment, I need either to make it up in the next time slot, or take time away from another activity. If I get ahead, I either keep going into the next time slot's allotment, or use the time for something else.

This. Generally speaking, I do whatever I can to kind of snowball items that take less time/are less important but need to be accomplished all the same. Then I can focus on the larger chore(s) for the week. My work is done from home with every other week meetings at my office. These are low on the importance list, they only take a couple hours so a total of about 4 hrs a month. My day to day work is more important but, unless there is a rush, I am done by noon (I start around 5:30am). This leaves about 3 hrs a day to do the required daily household chores then the evening free for kids activity/homework/etc and mom and dad time.
 

IZthe411

Carerra Lu
Joined
Jul 19, 2009
Messages
2,585
MBTI Type
INTJ
Combo.....

I like defining by things by blocks of time, and then go HAM for that duration. I'll put that down then look at something else. Keeps it fresh.
 

Ghost of the dead horse

filling some space
Joined
Sep 7, 2007
Messages
3,553
MBTI Type
ENTJ
I've tried to find out the relative merits of each method but I haven't yet been able to fix a good combo system that uses the both. I just schedule other tasks with a) and leave the (b) unscheduled, doing them whenever situation allows (i.e. there's lack of a-type tasks).

I'll call method a timeslotting and method b priority listing.

Timeslotting (a) benefits:
-you can easily see when your time is full or reserved for some other activity
-time estimates are built into the system
-forces you to recognize the problems of running late or using too much time on something, as you might need to reshedule some things
problems:
-if there's lot of variable time tasks or tasks with inaccurate time estimates, there's lot of rescheduling and inconvenience
-encourages the "work expands to fill the available time" syndrome.

Priority listing (b) benefits:
-eliminates the "work expands to fill the available time" syndrome as it's focused on results
-forces you to think about the requirements for each task
-priorities change less than the exact time you've reserved for them, so there's less re-prioritizing than there would be rescheduling
problems:
-may lead to gross underestimates of time needed, as the tasks don't have a time component
-doesn't directly help to estimate how many / which tasks can be performed in a given time period

Just a few ideas. I sometimes find it hard to motivate myself for a-type tasks, thought they give a convenient estimate of how much I can do in a day.
 

Ghost of the dead horse

filling some space
Joined
Sep 7, 2007
Messages
3,553
MBTI Type
ENTJ
I've tried to find out the relative merits of each method but I haven't yet been able to fix a good combo system that uses the both. I just schedule other tasks with a) and leave the (b) unscheduled, doing them whenever situation allows (i.e. there's lack of a-type tasks).

I'll call method a timeslotting and method b priority listing.

Timeslotting (a) benefits:
-you can easily see when your time is full or reserved for some other activity
-time estimates are built into the system
-forces you to recognize the problems of running late or using too much time on something, as you might need to reshedule some things
problems:
-if there's lot of variable time tasks or tasks with inaccurate time estimates, there's lot of rescheduling and inconvenience
-encourages the "work expands to fill the available time" syndrome.

Priority listing (b) benefits:
-eliminates the "work expands to fill the available time" syndrome as it's focused on results
-forces you to think about the requirements for each task
-priorities change less than the exact time you've reserved for them, so there's less re-prioritizing than there would be rescheduling
problems:
-may lead to gross underestimates of time needed, as the tasks don't have a time component
-doesn't directly help to estimate how many / which tasks can be performed in a given time period

Just a few ideas. I sometimes find it hard to motivate myself for a-type tasks, thought they give a convenient estimate of how much I can do in a day.
 